Case Study: Enhancing Drainage System Efficiency & Business Continuity

Client: One of the largest Retailer in the UK

Duration: 7 years

Scope of Work: Drainage Recovery, Manhole Construction, Site Cleanse PPM, CCTV Inspections, Interceptor Dip Testing, and Interceptor Cleansing

Introduction:

For the past two years, Machmade Limited has had the privilege of partnering with this retailer to address critical drainage system needs at their site. Our comprehensive services have not only improved the efficiency of their drainage infrastructure but have also contributed to minimizing disruptions and ensuring uninterrupted operations.

Challenges:

The clients main foul system leading to the main outfall off-site required significant attention. Challenges included aging infrastructure, blockages, and the need for a comprehensive overhaul. Our task was to conduct major drainage recovery works while maintaining minimal disruption to their operational capacity.

Project Highlights:

60m Drainage Relay: We embarked on a crucial 60-meter drainage relay project to address the issues within the main foul system. This involved the replacement of deteriorating pipes, ensuring the efficient flow of wastewater.

New Manhole Construction: As part of the recovery works, we constructed new manholes strategically placed to enhance accessibility and maintenance. These manholes play a vital role in the overall functionality of the drainage system.

Proactive Preventive Maintenance: In addition to recovery works, we implemented a comprehensive Preventive Maintenance Plan (PPM) tailored to Amazon’s needs. This involved twice-yearly site cleanses, CCTV inspections, interceptor dip tests, and interceptor cleanses.

Results:

Improved Drainage Efficiency: The drainage relay and new manhole construction have significantly improved the efficiency of Amazon’s drainage system. Blockages and slowdowns are now a thing of the past.

Minimized Disruptions: Our team worked diligently to complete the works with minimal disruptions to their site operations. The project was executed with precision, ensuring uninterrupted service.

Enhanced Reliability: Regular site cleanses, CCTV inspections, and interceptor maintenance have enhanced the overall reliability of the drainage system. This proactive approach has helped prevent potential issues before they become major problems.

Conclusion:

Machmade Limited’s partnership with this client in addressing their drainage system needs has been a resounding success. Through a combination of major recovery works, new manhole construction, and ongoing preventive maintenance, we have not only improved the efficiency of their drainage system but have also ensured its continued reliability.  Machmades commitment to delivering high-quality services and our proactive approach to maintenance have helped maintain its site operations at maximum capacity, contributing to their success and business continuity.